Woith Engineering assisted the owners in redeveloping a commerical site along Great Falls' main commercial thoroughfare, 10th Avenue South, into a new Ace Hardware location. The site includes parking, loading docks, site utilities, and stormwater management systems with sediment removal controls. Site grading challenges included retaining walls, driveway approaches, and maintenance of the existing public alley through the center of the site.

Scope of Services - Our Role

Woith Engineering was responsible for the following:


  • Initial Site Planning and Evaluations

  • Ensuring Zoning Compliance

  • Accessible (ADA) Design of Parking Facilities

  • Non-motorized and Pedestrian Facilities

  • Grading and Drainage Design

  • Water Utility Design

  • Sanitary Sewer Utility Design

  • Flood Control Facilities
    Stormwater Conveyance​
    Stormwater Detention

  • Stormwater Treatment Facilities
    Pretreatment Facilities
    Extended Detention Basin

  • As-Builts and Construction Certification

  • Bidding and Contract Documentation

  • Construction Administration and Inspection

  • Cost Estimation