West Bank Landing
Great Falls, Montana
Developing the West Bank
Woith Engineering, Inc. has the great pleasure of being involved in one of Great Falls’ greatest urban redevelopments to date. Considering existing buildings, soils, and available space, the design team utilized all 12.5 acres that West Bank has to offer. The scope of work consisted of over 275,000 square feet of new office, retail, and living space, water and sanitary sewer utilities, and design of state-of-the-art stormwater treatment technology.
Scope of Services - Our Role
Woith Engineering was responsible for the following:
-
Initial Site Planning and Evaluations
-
Ensuring Zoning Compliance
-
Accessible (ADA) Design of Parking Facilities
-
Non-motorized and Pedestrian Facilities
-
Grading and Drainage Design
-
Water Main and Fire Hydrant Design
-
Sanitary Sewer Main Design
-
Flood Control Facilities
-
Stormwater Conveyance
-
Undergound Stormwater Detention
-
-
Stormwater Treatment Facilities
-
Permeable Interlocking Concrete Pavements
-
Bioretention Cells
-
-
As-Builts and Construction Certification
-
Bidding and Contract Documentation
-
Construction Administration and Inspection
-
Cost Estimation